Home » News » Successfully Delivery Transformer for ACK, Assisting in the Construction of WHR System for Indonesian Cement Plants

Successfully Delivery Transformer for ACK, Assisting in the Construction of WHR System for Indonesian Cement Plants

Views: 0     Author: Site Editor     Publish Time: 2023-09-27      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

The waste heat power generation system installed on the cement production line aims to build a pure low-temperature waste heat recovery power plant. The system mainly utilizes the waste heat resources of the grate cooler and preheater in the clinker production line.

Shine was successful delivery 8x3150kVA 10/0.44kV Transformers to Anhui Conch Kawasaki Engineering Co., Ltd. (ACK) on Sept 27th, 2023, helping Indonesia WHR System project in Cement Plant.

This transformer maximizes its ability to meet the various needs of the system. And with a long service life and high energy efficiency, it is suitable for the construction and treatment of green energy systems.


Send Us A Message

Quick Links

Product Category

Contact Us

Room 313, Dongbo Center, Intersection of Beijing Road and Yan'an Road, Baohe Dist, Hefei 230051, Anhui, China

Phone: +8619956079176
Skype: ++8618055171098
WhatsApp: +8618055171098
Email: contactus@shine-ep.com
Subscribe to our newsletter
Promotions, new products and sales. Directly to your inbox.
 
 Copyrights 2024 Shine Electric All rights reserved.